My 24' Launch
Re: My 24' Launch
More woodwork, jah. Here's No.2 being fitted up. The funky cleats on the chine logs are to cure a slight twist in the ply.
- Attachments
-
- No 2 Fit Up resize.jpg (144.17 KiB) Viewed 10870 times
Steve
Re: My 24' Launch
Satisfied with the fit-up, I took everything out and wet out the end grain on the frame and floor, and the bare locations on the hull. After they were done off-gassing, on went the thickened epoxy followed by the fillets. Here's No. 2 all bonded in. "R2D2" continues to stand watch in the fo'c's'le.
- Attachments
-
- No 2 Bond in resize.jpg (148.06 KiB) Viewed 11582 times
Steve
- Rainer
- Full Steam Ahead
- Posts: 306
- Joined: Sun Nov 22, 2009 5:42 pm
- Boat Name: Emma and Molly
- Location: Hannover, Germany
- Contact:
Re: My 24' Launch
Nice how everything comes together!
Thanks' for this picture.
Thanks' for this picture.
Rainer
www.steamboating.de
www.steamboating.de
Re: My 24' Launch
Pump and crosshead links by Mr Anderson. The fasteners are 10-32.
- Attachments
-
- Pump Links resize.jpg (181.95 KiB) Viewed 11568 times
Steve
Re: My 24' Launch
Here's the whole enchilada, sans pump and yoke, ready for mounting on the engine.
- Attachments
-
- Pump Beams w Links resize.jpg (198 KiB) Viewed 11568 times
Steve
Re: My 24' Launch
Wes,
Thank you very much for this brochure and information. No. 5 is "basic" without pumps, oilers, piping, etc., but more than I ever expected to have.
Thank you very much for this brochure and information. No. 5 is "basic" without pumps, oilers, piping, etc., but more than I ever expected to have.
Steve
Re: My 24' Launch
Engine pumps - piston and ram:
- Attachments
-
- piston and ram.jpg (87.41 KiB) Viewed 11473 times
Steve
Re: My 24' Launch
What Miss Ann calls a "pretty" shot: fitting up the pump links.
- Attachments
-
- LP Connecting Rod Close Up resize.jpg (106.12 KiB) Viewed 11473 times
Steve
Re: My 24' Launch
Merry Christmas from my works to yours!
- Attachments
-
- Christmas Eve resize.JPG (106.81 KiB) Viewed 11437 times
Steve